PRISMA Impianti and our multi-language team have successfully developed complex projects in more than 50 countries around the world.

PCR Copper high speed slitting machine
Slitting Lines L1 & L2 - Electrical and automation systemThis job covered the design, fabrication and delivery of a complete set of automation and electrical equipment for two high-speed ..

Read more

Combustion system upgrade for Pyrolysis furnaces
Category: Chemical
Combustion system upgrade for Pyrolysis furnaces. A new combustion system has been supplied for the existing pyrolysis furnaces. The retrofit has reduced the energy consumption and increased the ..

Read more

Burner Management System –  Gas Power Plant
Burner Management System -  Gas Power Plant. The multi-fuel Thermal Power Plant can use natural gas or blast furnace gas. The total production capacity of the 3 blocks is 480MW electricity, 160MW ..

Read more

PxTorque – Tension controller
Torque controller it's a key module for controlling a process line. More the material is breakable and more a fast and accurate torque controller is needful.PRISMA Impianti has developed pxTorque..

Read more

Fuel train design
Category: Chemical
PRISMA Impianti designed and supplied fuel trains for various fuels: gas, diesel or heavy fuel oil. The trains are installed on self-supporting skids. They are very well structured in order to ..

Read more

Revamping of reheating furnace for slabs
This revamping included the refractory relining and the replacement of the combustion equipment. We engineered, supplied and installed a new combustion system, which includes piping, valves, burners, ..

Read more